Full range of CPR Trisecur® R.F. Top FTG18OM16-0,6/1 kV cable completed
Posted in   on Company news, Featured, Market info, news lato slider (EN)

La Triveneta Cavi is pleased to announce to its customers the completion of the homologation of the CPR cable Trisecur R.F. Top FTG18OM16-0,6/1 kV with the acquisition of the IMQ EFP marking also for the formations with 7 or more conductors, for signaling and control, with sections 1,5 mm2 and 2,5 mm2.


The cable, constructed with high-performance LS0H compounds and with glass mica tape wrapping each conductor, guarantees high fire protection.

It complies with the Reaction to Fire classification B2ca- s1a, d1, a1 (CPR) and meets the Fire Resistance characteristics according to the latest edition of CEI 20-45.


As with the other FTG18OM16 formations manufactured by La Triveneta Cavi, this cable is suitable for permanent installation in buildings and other civil engineering works as, in the event of fire, it endures up to a temperature of 830°C for a minimum of 120 minutes.

Happy Easter 2021
Posted in   on Company news, Featured, news lato slider (EN)

La Triveneta Cavi wishes a Happy Easter to all its customers and collaborators

New facility expansions at La Triveneta Cavi S.p.A.
Posted in   on Company news, Featured, news lato slider (EN)

During 2020, despite the difficulties due to CoViD-19, La Triveneta Cavi S.p.A. chose to make important investments in order to expand its production facilities. A first construction site was opened at the plant in Via Orna 35 in Brendola, where a new production unit of 2.700 square meters was built in a neighboring area already acquired at the end of 2019. Here 3 new cable extrusion lines and 4 packaging plants have been installed.

A second expansion concerned Veneta Trafili, the company’s own wire-drawing plant located in Montecchio Maggiore, where a 4.300 square meter building was built and 3 new copper drawing lines were installed.

As a result of these substantial investments, since July 2020 La Triveneta Cavi S.p.A. has hired 40 new employees with the ambitious goal, for the year 2021, to increase the production volumes by about 10% in order to reach the target of 125.000 tons of cable produced.

These considerable investments will allow La Triveneta Cavi S.p.A., already the first Italian producer and the fourth in Europe, to increase its impact on the market of electric cables in which it has been a reference point for over 55 years.

Marchiol visited La Triveneta Cavi
Posted in   on Company news, Highlights, news lato slider (EN)

On November 25th we had the pleasure to host in La Triveneta Cavi headquarters, IN FULL SAFETY, our historical corregional partner MARCHIOL. The meeting was an opportunity both to learn more about the latest production news regarding CPR cables as well as to visit and illustrate the features of our new logistics unit.

Webinar CPR Electric Cables
Posted in   on Company news, Featured, news lato slider (EN)

Last November 18th, our technicians Giorgio Massignan and Gianluca Migliorelli held a technical seminar from the meeting room of our headquarters in Brendola which was attended by 40 operators selected by our partner Sonepar Italia. The webinar covered the CPR regulation with its latest updates, and the news on low and medium voltage electric cables certified by La Triveneta Cavi. We also focused on the importance of the IMQ EFP voluntary brand which has always been considered a plus by our company. For this reason our R&D departments are every day in the forefront for the realization of cables that meet all legal requirements; in the last three years alone more than 100 types of CPR branded cables have been created. Waiting to resume the live seminars, always appreciated in the past years by our customers, La Triveneta Cavi is available to carry out technical training with its strategic partners.

Yair Duchovni Cables ltd visited La Triveneta Cavi
Posted in   on Company news, Featured, news lato slider (EN)

What a pleasure to receive a visit from Israel’s largest cable distributor. Thanks to Mr Yair Duchovni and Mr Yaron Bergman.…Read more

The Marassi Lantern lights up thanks to LTC

After the Dacia Arena in Udine (one of the most innovative sports facilities in Italy), even the energy of the Marassi stadium in Genoa, starting from the current football season, is flowing through electric cables produced by La Triveneta Cavi. In fact, for the recent restyling of the famous Ligurian stadium, a large supply of our cables has been selected. The Luigi Ferraris Stadium is 110 years old and is the oldest football stadium still working in our country, recognized as one of the sports facilities that has made the history of Italian football. In 1933, between the two wars, it was named after Luigi Ferraris, captain of Genoa who died in the First World War.

Trisecur FG16OM16, a perfect cable for Stadium Marassi


27 kilometers of BT Trisecur FG16OM16 10G2.5 produced by La Triveneta Cavi were used in the works for the new lighting system of the stadium, mainly employed to power the lights and the safety lamps arranged on the entire surface of the stadium. Our Trisecur cable offers maximum safety and is in fact required by designers of sports facilities as it is resistant to weather and variable temperatures, with a guarantee of functioning for many events to come.

The version of FG16OM16 used for the Marassi stadium is 10-conductor


As reported by the website Calcio e Finanza –  there is a project worth over 40 million euros to be implemented over the next three years.

The project includes the construction of a “sky box” area with luxury lounges dedicated to companies and sponsors, the renovation of the changing rooms, the construction of a conference center, entertainment areas, restaurants and shops. 

For this facility Forum LED projectors (by Disano illuminazione Spa) were chosen, the spotlights that have brought the quality of LED lighting up to the level of large sports facilities. In addition to energy savings, the perfect stability of the light, with high color rendering, guarantees high-definition TV shooting and maximum comfort for both players and visitors.  

The new Luigi Ferraris stadium system includes 240 1392W Forum LED projectors with 3 different optics, replacing the 368 old generation 2000W lights.

H1Z2Z2-K: LTC presents the new HAR and CPR certified Photovoltaic Cable
Posted in   on Company news, Featured, Latest News, Market info, news lato slider (EN)

In a global context increasingly devoted to green energies, the photovoltaic field in Europe is about to experience a new moment of growth.

As proof of its efforts in terms of research and sustainable development, La Triveneta Cavi has designed the new harmonized photovoltaic cable H1Z2Z2-K, whose characteristics make it ideal for connecting and carrying energy to new generation panels. The H1Z2Z2-K cable is suitable for photovoltaic installations in industry, in public, private and industrial buildings, photovoltaic parks, lighting and work areas in general.

The H1Z2Z2-K cable, certified HAR and CPR (reaction to fire class: Eca) is a cable that offers high safety standards being flame retardant and LS0H (Low Smoke Zero Halogen). It also has a high resistance to UV rays and low temperatures with a guaranteed life cycle of at least 25 years (EN 60216-1). Available in Black and Red colors.  

Characteristics of H1Z2Z2-K cable

-Maximum conductor temperature 120°

– Guaranteed life cycle: minimum 25 years (EN 60216-1).

– LS0H: Low Smoke Zero Halogen 

– Flame retardant

– Fire reaction class: Eca

– HAR certification 

– Excellent flexibility for an easier installation.

– UV and low temperature resistant

– Rated operating voltage – AC: 1000V and DC: 1500V

– Formations from 1×1,5mm2 to 1x120mm2

Have a nice Holiday!
Posted in   on Company news, Featured

We are closed from Thursday 8 until Wednesday 28 August included.