Another prestigious supply for La Triveneta Cavi, which has delivered several kilometres of RG7H1(AN)R-18/30 kV cable to the Nardò Technical Center (Lecce), one of the most important test centres in the world, where a wide range of high-level testing and engineering services dedicated to the entire automotive industry are performed.
The RG7H1(AN)R-18/30 kV cable supplied by LTC is suitable for transporting energy between transformer rooms and large utilities. It is a medium voltage cable that can be buried for direct or indirect laying in accordance with CEI 11-17. Thanks to the aluminium armouring that protects the conductor, it is suitable in environments with possible mechanical damage and/or the presence of rodents, guaranteeing continuity of service.
Since 2012 the Lecce Test Centre has been an integral part of Porsche Engineering Group GmbH, the engineering service provider within the Porsche AG group that has been providing top-level engineering services to customers in the automotive industry and beyond for over 80 years.
With more than 700 hectares and a wide variety of test tracks and facilities, the Apulian facility offers testing solutions that meet the diverse needs of customers in accordance with the major trends in the automotive industry, whether it is testing combustion engines or advanced battery-electric vehicle systems.